437.5 kWp Self Ballasting thin film (Solyndra) Rooftop PV System
Role: EPC (Feasibility, Engineering and design, commissioning)
Commissioned: May 2012
Construction: Green and Clean Energy Company
Leading the Way, in
Solar Energy Design and Engineering
437.5 kWp Self Ballasting thin film (Solyndra) Rooftop PV System
Role: EPC (Feasibility, Engineering and design, commissioning)
Commissioned: May 2012
Construction: Green and Clean Energy Company